RBS provided the role of Validation Engineer on behalf of ISG and operating as an independent responsibility to achieve satisfactory MEP testing and commissioning and in accordance with BREEAM ‘Excellent’ environmental performance rating.

RBS were engaged at the commencement of the project to ensure quality checks in relation to the installation, commissioning, record drawing checks and certification and to the satisfaction of the Endurance Land and tenants Deloitte.

The MEP design concept was produced by Norman Disney Young in January 2019 and developed by mechanical / public health contactor Bower Fuller and electrical Contractor Moorcroft.

66 Shoe Lane is an existing 19,400m sq.office building currently including accommodation comprising of plant space and bike storage facilities in the basement, ground floor retail Nero & Balls Brothers Bar and seven office floors.

The building has main entrances at Ground level via Shoe Lane and secondary entrance from Athene Place passage with entrance areas generally retained.

The loading bay is from Robin Hood Court with a car lift in the rear of the building accessed from Thavies Inn Road. There is a cycle storage facility and shower room located in the basement with restricted access from Robin Hood Court.

The project was refurbished to CAT A specification to create enhanced office space with increased floor area by infilling two light wells on each floor and modifying lift cores to enable increased access for higher occupancy throughout.

The building will also increase in height to include an additional half floor office / function space on level 9.

Project 66 Shoe Lane, London EC4A 3BQ
Client ISG
Architect Stiff & Trevillion
Completion September 2020
Role Validation Engineer
Sector Office / Commercial
Value £30m

 

icon15-free-img.png

What we can do for you.

Download our company brochure

Buckingham-Group-Contracting-1

Been great working with you, definitely involving you guy’s from the start on the next one!

BUCKINGHAM GROUP
ecoworld

Rose Building Services attention to detail and general approach in bringing the contract to a close was relentless. Great Team Effort.

ECOWORLD
isg

RBS were very user friendly. They arrived on site almost immediately, understood the problems and took ownership. Organised and dedicated in executing the commissioning requirements.

ISG
icon07-free-img

our office

Rose Building Services

26 Lintot Square, Southwater,
West Sussex RH13 9LA

icon09-free-img

reach us on

01403 733 362

Call for enquiries

icon08-free-img

email us at

info@rosebuildingservices.com

Write to us for all your queries

Scroll to Top