Le Meridien Hotel, London

Fast Track Hotel Fit-Out project located at the heart of Piccadilly London. Project consisted of the complete refit of M&E services to 3 floors of a live hotel along with associated plant alterations.  The scope of works included the installation of 3 new mechanical service risers from basement through to level 12 roof tank room.

Works included placing into operation a new Cold water Boosted Pump system and its integration to existing building systems.

RBS were brought on to the project to establish early existing services surveys as well as managed the full M&E design development, coordination of installation and commissioning sign off. Reviews of As Built, O&M documentation and final account negotiations.

 

 

 

 

 

 

Project Le Meridien Hotel  
Client Starwood
Main Contractor TKS
Completion May 2018
Role Design/ Technical Services Management
Sector Leisure/Hotels
Value £11m

 

icon15-free-img.png

What we can do for you.

Download our company brochure

Buckingham-Group-Contracting-1

Been great working with you, definitely involving you guy’s from the start on the next one!

BUCKINGHAM GROUP
ecoworld

Rose Building Services attention to detail and general approach in bringing the contract to a close was relentless. Great Team Effort.

ECOWORLD
isg

RBS were very user friendly. They arrived on site almost immediately, understood the problems and took ownership. Organised and dedicated in executing the commissioning requirements.

ISG
icon07-free-img

our office

Rose Building Services

26 Lintot Square, Southwater,
West Sussex RH13 9LA

icon09-free-img

reach us on

01403 733 362

Call for enquiries

icon08-free-img

email us at

info@rosebuildingservices.com

Write to us for all your queries

Scroll to Top